Along the Newcastle Channel and the downtown waterfront, the Harbourfront Walkway is one of the simplest ways to take in Nanaimo’s harbour. The City of Nanaimo describes it as a multi-use trail whose width varies as it crosses different types of land ownership. The section listed in the City’s park directory is owned by the City and is marked as wheelchair accessible.
The walkway is also the centrepiece of a longer civic ambition. In December 2017, Nanaimo City Council endorsed the Nanaimo Waterfront Walkway Implementation Plan, which sets out a vision for a continuous multi-use pathway from Departure Bay to the Nanaimo River Estuary, for pedestrians and cyclists. The City says the plan is meant to expand and improve on existing sections of walkway built incrementally over the previous 30 years.
What is already open
The official project page notes that Nanaimo’s waterfront is a commercial and industrial hub, with shipyards, fishing docks, marinas, yacht clubs, and ferry and plane terminals, as well as parks and residential areas. In 2019, the City completed construction of approximately one kilometre of interim waterfront walkway on 1 Port Drive, with new asphalt, LED trail lighting, benches and waste receptacles. That stretch is now open to the public and allows people to walk or cycle between downtown and the cruise-ship terminal. The City says the walkway was built to an interim standard, but opened an area of the waterfront that had been private land and inaccessible.
A further phase, focused on Departure Bay, would connect the existing trail behind the BC Ferries terminal to the existing waterfront walkway near the Kin Hut at Kinsman Park. The City says that project has been deferred until 2027, when it will be considered by council together with other major capital projects.
A waterfront with a long history
The same official project page notes that Nanaimo and its surroundings are part of the ancestral home of the Snuneymuxw, a migratory Coast Salish people. The City writes that the Snuneymuxw — meaning “The Great People” in the Hul’qumi’num language — lived in several waterfront villages along Nanaimo’s shores from Departure Bay to Newcastle Island, and that the proposed walkway will travel through these important village sites while linking present-day parks, shipyards, marinas, transportation terminals and residential developments.
Good to know
- The City park listing describes the Harbourfront Walkway as a multi-use trail along the Newcastle Channel and downtown waterfront, and marks this City-owned section as wheelchair accessible.
- An approximately one-kilometre interim walkway on 1 Port Drive, completed in 2019, is open between downtown and the cruise-ship terminal.
- The longer waterfront-walkway plan, endorsed by council in 2017, envisions a continuous path from Departure Bay to the Nanaimo River Estuary. A Departure Bay expansion has been deferred until 2027.
- For current project information, see the City’s waterfront walkway page, or contact the City at 250-754-4251 or waterfrontwalkway@nanaimo.ca.
Photo: DXR, CC BY-SA 4.0, via Wikimedia Commons



